
Add to Cart
Packaging Details: | plywood case. |
---|---|
Delivery Detail: | 40-60 working days |
Commercial peanut butter production line.
1.CE .
2. Stainless steel 316L.
3.Vacuum and heating.
4.Capacity 520L
ZJR-650L Commercial peanut butter production line,Industrial peanut butter machine,Peanut butter processing equipment
The heating system is electric heating or steam heating that the temperature is automation control.
1) Equipment includes oil boiler, water boiler, emulsification kettle, vacuum equipment, temperature system,
cooling system and operation platform.
2) Suitable for heating, melting, mix, homogenizing and vacuum emulsification
3) Easy to operate
4) Steady, efficient and automatic
5) Dimensions.
a) Emulsifying rack (L x W x H): 2,500 x 1,350 x 3,230 / 4,560m
b) Water boiler and oil boiler rack (L x W x H): 2,500 x 1,150 x 1,950m
c) Table (L x W x H): 2,500 x 850m
d) Overall (L x W x H): 3,650 x 3,420 x (3,230 - 4,560)
Name | ZJR-650 | ZJR-850 | |
Emulsifying Pot | Design Volume (L) | 650 | 850 |
Capacity (L) | 520 | 680 | |
Scraper Stirring Power (KW) | 4 | 4 | |
Scraper Stirring Speed (rpm) | 0-65 | 0-65 | |
Homogenizer Power (KW) | 11 | 15 | |
Electrical Heating Power (KW) | 18 | 18 | |
Homogenizer Speed (rpm) | 2800 | 2800 | |
Water Pot | Design Volume (L) | 400 | 500 |
Capacity (L) | 320 | 400 | |
Power (KW) | 1.1 | 1.1 | |
Speed (rpm) | 960 | 960 | |
Electrical Heating Power (KW) | 18 | 18 | |
Oil Pot | Design Volume (L) | 320 | 400 |
Capacity (L) | 250 | 300 | |
Power (KW) | 1.1 | 1.5 | |
Speed (rpm) | 960 | 960 | |
Electrical Heating Power (KW) | 12 | 12 |
Dimension (mm):
Name | ZJR-650L | ZJR-850L | ||||
Length | Width | Height | Length | Width | Height | |
Emulsifying Pot Rack | 2500 | 1350 | 3230-4560 | 2650 | 1450 | 3350-4750 |
Water and Oil Pot Rack | 2500 | 1150 | 1950 | 2650 | 1280 | 1950 |
Table | 2500 | 850 | 2650 | 850 | ||
Overall | 3650 | 3420 | 3230-4560 | 3750 | 3550 | 3350-4750 |
1.Warranty time: one year, from the date which the product is qualified commissioning. Any damage except the
wrong operation during warranty period is repaired freely. But the travel and hotel expenses should be count on buyer.
2. Commissioning services: the product's installation and commissioning at the demand side, our engineers will not
leave there untill get your agreement.
3. Training services: our engineers will train your staff to operate it during the period of installation and commissioning,
and they will not leave there until your staff can operate it properly and normally.
4. Maintenance services: any malfunction happened, once you enquiry us, we will reply you within 48 hours except the
special reasons.
5. Lifelong services: we provide lifelong services for all the products we sold out, and supply the spare parts with discount
price.6. Certificate services: we can provide related certificates to customers freely according to the request of customers.
7. Inspection services: you can ask the third part inspection company or your inspector to inspect the products before
shipment.
8. The file: the Manual Specification, report of the material which used to the equipment and others documents related
to the GMP authentication information will be provided by us.